Questionnaire: Pipelines, Advanced Chemical Cleaning
Company Details :
Date :
Date reply is required :
Company :
Phone :
Address :
Fax :
E-mail :
Mobile :
Contact Person :
Title :
Actual Pipeline Data :
Project location :
From :
To :
Type pipeline :
Oil/Gas/Product/Other :
Length :
Diameter :
Inch/mm ID (mm) :
Wall thickness (Inch/mm) :
Material :
Actual Pressure :
Differential Pressure :
Pressure :
Copyright 2010 Analytical Pipeline Solutions: Pipeline Cleaning. All Rights Reserved.
Rating
Flow rate :
Crossovers :
Tees :
Equipped with bars :
Valves full bore :
Type :
Remarks :
Pig ability Data
Pigs in pipeline :
In case "yes", please describe :
Launcher available :
-size :
-valves :
-nozzles :
-design P. :
-drawing :
Propelling source :
Receiver available :
-size :
-valves :
-nozzles :
-design P. :
-drawing :
Water in vicinity :
Remarks :
Cleaning Data
Online cleaning required :
High Pressure Separator required :
Offline cleaning required :
Sample sediment available :
Type of contamination and/or debris/solids :
Remarks :
Pipeline History
In service since :
Pigging program :
Type of pigs used :
Frequency :
Date last pigging :
Problems :
Remarks :
Problems
Reason for Cleaning :
Drawings to be preferably included:
P&ID/Pipeline Facility :
Diagram/Length Profile/Route Maps/Locations/Other
Please indicate your request, by ticking the appropriate box :